[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1119637":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},1119637,789,1,"单选题","隐蔽工程在隐蔽前应通知（）及有关方面进行验收，并形成验收文件。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","施工单位质量部门",false,{"key":16,"text":17,"correct":14},"B","设计单位",{"key":19,"text":20,"correct":21},"C","监理单位",true,{"key":23,"text":24,"correct":14},"D","政府质量监督部门","2021\u002F2020教材P238页 经承包人自检确认的工程隐蔽部位具备覆盖条件后，承包人应通知监理人在约定的期限内检查。",{"id":6,"name":27,"category":28,"favorite":29},"二建建设工程施工管理","建筑工程",0]