[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1119587":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},1119587,789,1,"单选题","关于施工总承包管理模式，下列表述正确的是（）。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","施工总承包管理单位只负责对现场施工的总体管理和协调，不负责向分包人提供相应的服务",false,{"key":16,"text":17,"correct":14},"B","施工总承包管理模式的招标依赖于设计图纸出齐",{"key":19,"text":20,"correct":21},"C","施工总承包管理单位只收取总包管理费，不赚总包与分包之间的价差",true,{"key":23,"text":24,"correct":14},"D","施工总承包管理单位只负责管理与协调，对项目目标控制不承担责任","2021\u002F2020教材P226页 5、施工总承包管理的合同价格（3）施工总承包管理单位只收取总包管理费，不赚总包与分包之间的差价。",{"id":6,"name":27,"category":28,"favorite":29},"二建建设工程施工管理","建筑工程",0]