[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1119570":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},1119570,789,1,"单选题","对施工任务的平行发包，发包人可以根据建设项目的结构进行分解分包，也可以根据建设项目施工的（）进行分解发包",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","不同部位",false,{"key":16,"text":17,"correct":14},"B","不同投资额",{"key":19,"text":20,"correct":21},"C","不同专业系统",true,{"key":23,"text":24,"correct":14},"D","不同特点","2021\u002F2020教材P223页 “对施工任务的平行发包，发包方可以根据建设项目的结构进行分解发包，也可以根据建设项目施工的不同专业系统进行分解发包”.",{"id":6,"name":27,"category":28,"favorite":29},"二建建设工程施工管理","建筑工程",0]