[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1119466":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},1119466,789,1,"单选题","根据《建设工程施工现场管理规定》.清理高层建筑施工垃圾的正确做法是（）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","将各楼层施工垃圾装入密封容器后吊走",true,{"key":16,"text":17,"correct":18},"B","将各楼层施工垃圾焚烧后装人密封容器吊走",false,{"key":20,"text":21,"correct":18},"C","将施工垃圾洒水后沿临边窗口倾倒至地面后集中处理",{"key":23,"text":24,"correct":18},"D","将施工垃圾从电梯井倾倒至地面后集中处理","2021\u002F2020教材P217~218页 建筑物内垃圾场应采用容器或搭设专用封装式垃圾道的方式清运，严禁凌空抛掷",{"id":6,"name":27,"category":28,"favorite":29},"二建建设工程施工管理","建筑工程",0]