[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1119286":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},1119286,789,1,"单选题","建设工程实行总承包的，由()对施工现场的安全生产负总责并自行完成工程主体结构的施工。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","分包单位",false,{"key":16,"text":17,"correct":14},"B","建设单位",{"key":19,"text":20,"correct":21},"C","总承包单位",true,{"key":23,"text":24,"correct":14},"D","监理单位","2021\u002F2020教材P191页 建设工程实行总承包的，由总承包单位对施工现场的安全生产负总责并自行完成工程主体结构的施工。",{"id":6,"name":27,"category":28,"favorite":29},"二建建设工程施工管理","建筑工程",0]