[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1119255":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},1119255,789,1,"单选题","环境管理体系的运行模式是由（）构成的动态循环过程。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","策划、实施、检查、协调和改进",false,{"key":16,"text":17,"correct":14},"B","策划、实施、检查、评审和协调",{"key":19,"text":20,"correct":14},"C","策划、实施、检查、协调和处置",{"key":22,"text":23,"correct":24},"D","策划、支持与运行、绩效评价、改进",true,"2021\u002F2020教材P188页 环境管理体系的结构系统，采用的是PDCA动态循环、不断上升的螺旋式管理运行模式，在策划、支持与运行、绩效评价、改进四大要素构成的动态循环过程基础上，结合环境管理的特点，考虑组织所处环境，内外部问题，相关方需求及期望等因素，形成完整的持续改进动态管更替体系",{"id":6,"name":27,"category":28,"favorite":29},"二建建设工程施工管理","建筑工程",0]