[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1119253":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},1119253,789,1,"单选题","《环境管理体系要求及使用指南》总体结构中，策划中的应对风险和机遇的措施内容是( )。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","总则、环境因素、合规义务、措施的策划",true,{"key":16,"text":17,"correct":18},"B","最高管理者应确定本组织的环境方针",false,{"key":20,"text":21,"correct":18},"C","资源、作用、职责和权限，能力、培训和意识，信息交流等",{"key":23,"text":24,"correct":18},"D","监测和测量，合规性评价，记录控制等","2021\u002F2020教材P187页 策划中的应对风险和机遇的措施内容是总则、环境因素、合规义务、措施的策划",{"id":6,"name":27,"category":28,"favorite":29},"二建建设工程施工管理","建筑工程",0]