[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1119227":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},1119227,789,1,"单选题","建设工程政府质量监督机构参加项目的竣工验收会议的目的是()。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","对建设过程质量情况进行总结，签发竣工验收意见书",false,{"key":16,"text":17,"correct":14},"B","对影响结构安全的工程实体质量进行检查验收",{"key":19,"text":20,"correct":14},"C","对影响使用功能的相关部分进行检查验收",{"key":22,"text":23,"correct":24},"D","对质量验收的程序、组织、方法、过程等进行监督",true,"2021\u002F2020教材P183页 （2）竣工验收时，参加竣工验收的会议，对验收的程序及验收的过程进行监督。",{"id":6,"name":27,"category":28,"favorite":29},"二建建设工程施工管理","建筑工程",0]