[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1119214":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},1119214,789,1,"单选题","技术交底应在施工作业前由( )进行交底。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","项目技术负责人向承担施工的负责人",true,{"key":16,"text":17,"correct":18},"B","项目经理向承担施工的负责人",false,{"key":20,"text":21,"correct":18},"C","企业总工程师向项目技术负责人",{"key":23,"text":24,"correct":18},"D","监理工程师向项目技术人员","2021\u002F2020教材P166页 做好技术交底是保证施工质童的重要措施之一。项目开工前应由项目技术负责人向承 担施工的负责人或分包人进行书面技术交底，技术交底资料应办理签字手续并归档保存。",{"id":6,"name":27,"category":28,"favorite":29},"二建建设工程施工管理","建筑工程",0]