[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1119204":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},1119204,789,1,"单选题","质量控制点的选择应以那些保证质量难度大的、对质量影响大的或是发生质量问题时危害大的对象进行设置。具体选择的原则表述不正确的是()。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","对工程质量形成过程产生直接影响的关键部位、工序或环节及隐蔽工程",false,{"key":16,"text":17,"correct":14},"B","对施工过程中的薄弱环节，或者质量不稳定的工序、部位或对象",{"key":19,"text":20,"correct":14},"C","对施工上无把握的、施工条件困难的或技术难度大的工序或环节",{"key":22,"text":23,"correct":24},"D","对下道工序影响较小的上道工序",true,"2021\u002F2020教材P169页 量不稳定的工序、部位或对象；对下道工序有较大影响的上道工序；采用新技术、新工艺、新材料的部位或环节；对施工上无把握的、施工条件困难的或技术难度大的工序或环节；用户反馈指出和过去有过返工的不良工序。",{"id":6,"name":27,"category":28,"favorite":29},"二建建设工程施工管理","建筑工程",0]