[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1119165":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},1119165,789,1,"单选题","建设工程项目开工前，工程质量监督的申报手续应由项目()负责。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","建设单位",true,{"key":16,"text":17,"correct":18},"B","施工企业",false,{"key":20,"text":21,"correct":18},"C","监理单位",{"key":23,"text":24,"correct":18},"D","设计单位","2021\u002F2020教材P182页 一、受理建设单位办理质量监督手续 在工程项目开工前，监督机构接受建设单位有关建设工程质量监督的申报手续，并对建设单位提供的有关文件进行审查，审查合格签发有关质量监督文件。建设单位凭工程质量监督文件，向建设行政主管部门申领施工许可证。",{"id":6,"name":27,"category":28,"favorite":29},"二建建设工程施工管理","建筑工程",0]