[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1119144":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},1119144,789,1,"单选题","下列施工质量控制措施中，属于事前控制的是()。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","设计交底",true,{"key":16,"text":17,"correct":18},"B","重要结构实体检测",false,{"key":20,"text":21,"correct":18},"C","隐蔽工程验收",{"key":23,"text":24,"correct":18},"D","施工质量检查验收","2021\u002F2020教材P161页 事前控制：即在正式施工前进行的事前主动质量控制，设计交底：项目开工前应由项目技术负责人向承担施工的负责人或分包人进行书面设计交底。",{"id":6,"name":27,"category":28,"favorite":29},"二建建设工程施工管理","建筑工程",0]