[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1119043":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},1119043,789,1,"单选题","在施工过程的工程质量验收中发现质量不符合要求时，如经检测鉴定达不到设计要求，但经原设计单位核算，仍能满足结构安全和使用功能的情况，该检验批()。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","应返工重做后重新验收",false,{"key":16,"text":17,"correct":14},"B","需与建设单位协商一致方可验收",{"key":19,"text":20,"correct":21},"C","可予以验收",true,{"key":23,"text":24,"correct":14},"D","由监督机构决定是否予以验收","2021\u002F2020教材P172页 第三种情况，如经检测鉴定达不到设计要求，但经原设计单位核算，仍能满足结构安 全和使用功能的情况，该检验批可以予以验收。一般情况下，规范标准给出了满足安全和 功能的最低限度要求，而设计往往在此基础上留有一些余量。不满足设计要求和符合相应 规范标准的要求，两者并不一定矛盾。",{"id":6,"name":27,"category":28,"favorite":29},"二建建设工程施工管理","建筑工程",0]