[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1119024":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},1119024,789,1,"单选题","关于一般情况下检验批和分项工程关系的说法，正确的是( )。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","分项工程是检验批验收的基础",false,{"key":16,"text":17,"correct":14},"B","两者有着截然不同的性质",{"key":19,"text":20,"correct":21},"C","两者具有相同或相近的性质，只是批量的大小不同而已",true,{"key":23,"text":24,"correct":14},"D","检验批是按照工程划分的，而分项工程是按照施工部位划分的","2021\u002F2020教材P171页 分项工程的验收在检验批的基础上进行。一般情况下，两者具有相同或相近的性质，只是批量的大小不同而已。",{"id":6,"name":27,"category":28,"favorite":29},"二建建设工程施工管理","建筑工程",0]