[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1119023":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},1119023,789,1,"单选题","关于分部工程质量验收合格应符合的规定，下列说法不正确的是（ ） 。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","所含分项工程的质量均验收合格",false,{"key":16,"text":17,"correct":14},"B","质量控制资料完整",{"key":19,"text":20,"correct":21},"C","工程施工符合设计文件的要求",true,{"key":23,"text":24,"correct":14},"D","观感质量验收符合要求","2021\u002F2020教材P171页 3.分部工程质量验收合格应符合下列规定：（1）所含分项工程的质量均应验收合格。（2）质量控制资料应完整。（3）有关安全、节能、 环境保护和主要使用功能的检验结果应符合相应规定。（4）观感质量应符合要求。",{"id":6,"name":27,"category":28,"favorite":29},"二建建设工程施工管理","建筑工程",0]