[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1119021":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},1119021,789,1,"单选题","检验批的合格质量主要取决于对()的检验结果。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","主控项目和一般项目",true,{"key":16,"text":17,"correct":18},"B","一般项目和允许偏差项目",false,{"key":20,"text":21,"correct":18},"C","观感质量和质量资料",{"key":23,"text":24,"correct":18},"D","主控项目和允许偏差项目","2021\u002F2020教材P171页 检验批的合格质量主要取决于对主控项目和一般项目的检验结果。主控项目是对检验批的基本质量起决定性影响的检验项目，因此，必须全部符合有关专业工程验收规范的规定。",{"id":6,"name":27,"category":28,"favorite":29},"二建建设工程施工管理","建筑工程",0]