[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1119012":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},1119012,789,1,"单选题","施工质量控制点应选择()、对质量影响大或是发生质量问题时危害大的对象进行设置。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","劳动强度大",false,{"key":16,"text":17,"correct":18},"B","保证质量难度大",true,{"key":20,"text":21,"correct":14},"C","施工技术先进",{"key":23,"text":24,"correct":14},"D","施工管理要求高","2021\u002F2020教材P169页 质量控制点的选择应以那些保证质量难度大、对质量影响大或是发生质量问题时危害大的对象进行设置。",{"id":6,"name":27,"category":28,"favorite":29},"二建建设工程施工管理","建筑工程",0]