[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1119009":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},1119009,789,1,"单选题","施工过程的质量控制，必须以()为基础和核心",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","工序的质量控制",true,{"key":16,"text":17,"correct":18},"B","最终产品的质量控制",false,{"key":20,"text":21,"correct":18},"C","实体质量控制",{"key":23,"text":24,"correct":18},"D","质量控制点","2021\u002F2020教材P167页 因此，工序的质量控制是施工阶段质量控制的重点。",{"id":6,"name":27,"category":28,"favorite":29},"二建建设工程施工管理","建筑工程",0]