[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1118929":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},1118929,789,1,"单选题","施工质量控制是在明确的质量方针指导下，通过对施工方案和资源配置的计划、实施、检查和处置，进行施工质量目标()的系统过程。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","前期控制和后期控制",false,{"key":16,"text":17,"correct":18},"B","事前控制、事中控制和事后控制",true,{"key":20,"text":21,"correct":14},"C","整体控制和重点控制",{"key":23,"text":24,"correct":14},"D","阶段性控制和全过程控制","2021\u002F2020教材P161页 施工质量控制应贯彻全过程质量管理的思想，运用动态控制原理，进行质量的事前控制，事中控制和事后控制。",{"id":6,"name":27,"category":28,"favorite":29},"二建建设工程施工管理","建筑工程",0]