[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1118887":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},1118887,789,1,"单选题","工程项目质量计划可以按（ ）分为质量工作计划和质量成本计划。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","工期",false,{"key":16,"text":17,"correct":14},"B","用途",{"key":19,"text":20,"correct":14},"C","质量目标",{"key":22,"text":23,"correct":24},"D","内容",true,"2021\u002F2020教材P157页 2.项目施工质量计划 工程项目施工质量计划按内容分为施工质量工作计划和施工质量成本计划。",{"id":6,"name":27,"category":28,"favorite":29},"二建建设工程施工管理","建筑工程",0]