[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1118880":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},1118880,789,1,"单选题","建设工程项目质量管理的PDCA循环工作原理中，“C”是指()。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","计划",false,{"key":16,"text":17,"correct":14},"B","实施",{"key":19,"text":20,"correct":21},"C","检查",true,{"key":23,"text":24,"correct":14},"D","处理","2021\u002F2020教材P158页 施工质量保证体系的运行，应以质量计划为主线，以过程管理为重心，应用 PDCA循环的原理，3.检查(Check)",{"id":6,"name":27,"category":28,"favorite":29},"二建建设工程施工管理","建筑工程",0]