[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1118871":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},1118871,789,1,"单选题","项目质量保证体系，必须有明确的质量目标，并符合质量总目标的要求。以( )为基本依据，逐级分解目标以形成在合同环境下的项目质量保证体系的各级质量目标。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","工程承包合同",true,{"key":16,"text":17,"correct":18},"B","工程设计文件",false,{"key":20,"text":21,"correct":18},"C","工程分包合同",{"key":23,"text":24,"correct":18},"D","工程成本计划","2021\u002F2020教材P157页 施工质量体系的内容 项目施工质量目标项目施工质量体系，必须有明确的质量目标，并符合项目质量总目标的要求；要以工程承包合同为基本依据，逐级分解目标以形成在合同环境下的项目施工质量保证体系的各级质量目标。",{"id":6,"name":27,"category":28,"favorite":29},"二建建设工程施工管理","建筑工程",0]