[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1118859":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},1118859,789,1,"单选题","工程质量终检的局限性主要是因为()。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","工程形体庞大",false,{"key":16,"text":17,"correct":14},"B","施工生产的流动性",{"key":19,"text":20,"correct":14},"C","建筑产品的单件性",{"key":22,"text":23,"correct":24},"D","不能通过拆卸或解体来检查内在质量",true,"2021\u002F2020教材P155页 工程项目建成以后不能像一般工业产品那样，可以依靠终检来判断和控制产品的质量；也不可能像工业产品那样将其拆卸或解体检查内在质量，或更换不合格的零部件。",{"id":6,"name":27,"category":28,"favorite":29},"二建建设工程施工管理","建筑工程",0]