[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1118808":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},1118808,789,1,"单选题","施工进度控制在管理观念方面存在的主要问题不包括()。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","缺乏进度计划系统的观念",false,{"key":16,"text":17,"correct":14},"B","缺乏动态控制的观念",{"key":19,"text":20,"correct":14},"C","缺乏进度计划多方案比较和优选的观念",{"key":22,"text":23,"correct":24},"D","缺乏全程控制的观念",true,"2021\u002F2020教材P150页 施工进度控制在管理观念方面存在的主要问题是：缺乏进度计划系统的观念、缺乏动态控制的观念、缺乏进度计划多方案比较和优选的观念。",{"id":6,"name":27,"category":28,"favorite":29},"二建建设工程施工管理","建筑工程",0]