[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1118703":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},1118703,789,1,"单选题","施工企业进度控制的任务是依(),按照施工进度的要求控制施工进度。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","建设项目总进度目标",false,{"key":16,"text":17,"correct":14},"B","施工总进度计划",{"key":19,"text":20,"correct":14},"C","建安工程工期定额",{"key":22,"text":23,"correct":24},"D","施工承包合同",true,"2021\u002F2020教材P148页 施工方进度控制的任务是依据施工承包合同,按照施工进度的要求控制施工工作进度,这是施工方履行合同的义务。",{"id":6,"name":27,"category":28,"favorite":29},"二建建设工程施工管理","建筑工程",0]