[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1118690":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},1118690,789,1,"单选题","当计算工期不能满足要求工期时，可通过压缩关健工作的持续时间以满足工期要求，在选择缩短持续时间的关键工作时应考虑的因素不包括( )。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","缩短持续时间对综合效益影响不大",true,{"key":16,"text":17,"correct":18},"B","缩短持续时间对质量和安全影响不大",false,{"key":20,"text":21,"correct":18},"C","缩短持续时间所需增加的费用最小",{"key":23,"text":24,"correct":18},"D","有充足的备用资源","2021\u002F2020教材P148页 当计算工期不能满足要求工期时，可通过压缩关键工作的持续时间以满足工期要求。在选择缩短持续时间的关键工作时，宜考虑下述因素： (1)缩短持续时间对质量和安全影响不大的工作； (2)有充足备用资源的工作； (3)缩短持续时间所需增加的费用最少的工作等。",{"id":6,"name":27,"category":28,"favorite":29},"二建建设工程施工管理","建筑工程",0]