[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1118478":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},1118478,789,1,"单选题","施工项目经理部定的某分部分项工程成本计划，属于（）成本计划",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","战略性",false,{"key":16,"text":17,"correct":14},"B","竞争性",{"key":19,"text":20,"correct":14},"C","指导性",{"key":22,"text":23,"correct":24},"D","实施性",true,"2021\u002F2020教材P102页 实施性成本计划以项目实施方案为依据，落实项目经理成本目标为出发点。",{"id":6,"name":27,"category":28,"favorite":29},"二建建设工程施工管理","建筑工程",0]