[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1118462":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},1118462,789,1,"单选题","某工程采用工程量清单计价招标，工程量清单中的挖方量为2800m3，投标人根据地质资料和施工方案计算的挖方量为5200m3，人工费为44000元，材料费为16000元，机械费为39000元，管理费以人、材、机费合计为计算基础，费率为17%，利润以人、材、机费与管理费合计为计算基础，费率为10%，则投标人填报的综合单价应为（）元\u002Fm3。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","24.5",false,{"key":16,"text":17,"correct":18},"B","45.5",true,{"key":20,"text":21,"correct":14},"C","24.2",{"key":23,"text":24,"correct":14},"D","44.9","2021\u002F2020教材P66页 管理费以人、材、机费合计为计算基础，则管理费=（44000+16000+39000）×17%=16830元 利润以人、材、机费与管理费合计为计算基础，则利润=（44000+16000+39000+16830）×10%=11583元 综合单价=（人、材、机费+管理费+利润）\u002F清单工程量=（44000+16000+39000+16830+11583）\u002F2800=45.5\u002Fm2",{"id":6,"name":27,"category":28,"favorite":29},"二建建设工程施工管理","建筑工程",0]