[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1118447":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},1118447,789,1,"单选题","为了取得施工成本管理的理想效果，项目经理可采取的经济措施是()",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","对不同的技术方案比选和进行技术经济分析",false,{"key":16,"text":17,"correct":14},"B","加强施工调度，避免窝工损失",{"key":19,"text":20,"correct":21},"C","对各种变更及时落实业主签证，及时结算工程款",true,{"key":23,"text":24,"correct":14},"D","研究合同条款，寻找索赔机会","2021\u002F2020教材P101页 经济措施是最易为人们所接受和采用的措施。……对各种变更，及时做好增减账，及时落实业主签证，及时结算工程款。",{"id":6,"name":27,"category":28,"favorite":29},"二建建设工程施工管理","建筑工程",0]