[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1118445":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},1118445,789,1,"单选题","采用( )控制施工成本，应贯穿于整个合同周期。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","组织措施",false,{"key":16,"text":17,"correct":14},"B","技术措施",{"key":19,"text":20,"correct":14},"C","经济措施",{"key":22,"text":23,"correct":24},"D","合同措施",true,"2021\u002F2020教材P101页 采用合同措施控制施工成本，应贯穿整个合同周期。",{"id":6,"name":27,"category":28,"favorite":29},"二建建设工程施工管理","建筑工程",0]