[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1118432":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},1118432,789,1,"单选题","编制工程量清单时，若有总承包服务费，则应列在( )中。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","分部分项工程量清单",false,{"key":16,"text":17,"correct":14},"B","措施项目清单",{"key":19,"text":20,"correct":14},"C","其他项目清单的招标人部分",{"key":22,"text":23,"correct":24},"D","其他项目清单的投标人部分",true,"2021\u002F2020教材P69页 其他项目费由暂列金额、暂估价、计日工、总承包服务费等内容构成。计日工和总承包服务费由承包人根据招标人提出的要求，按估算的费用确定。",{"id":6,"name":27,"category":28,"favorite":29},"二建建设工程施工管理","建筑工程",0]