[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1118425":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},1118425,789,1,"单选题","根据生产技术和施工组织条件，对施工过程中各工序采用测时法、写实记录法、工作日写实法，测出各工序的工时消耗等资料，再对所获得的资料进行科学的分析，制定出人工定额的方法是()。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","技术测定法",true,{"key":16,"text":17,"correct":18},"B","统计分析法",false,{"key":20,"text":21,"correct":18},"C","比较类推法",{"key":23,"text":24,"correct":18},"D","经验估计法","2021\u002F2020教材P60页 技术测定法是根据生产技术和施工组织条件，对施工过程中各工序采用测时法、写实记录法、工作日写实法，测出各工序的工时消耗等资料，再对所获得的资料进行科学的分析，制定出人工定额的方法。",{"id":6,"name":27,"category":28,"favorite":29},"二建建设工程施工管理","建筑工程",0]