[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1118397":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},1118397,789,1,"单选题","下列不属于因素分析法的计算步骤的是()。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","确定分析对象，并计算出实际与目标数的差异",false,{"key":16,"text":17,"correct":14},"B","确定该指标是由哪几个因素组成的，并按其相互关系进行排序",{"key":19,"text":20,"correct":21},"C","以目标数为基础，将各因素的目标数相加作为分析替代的基数",true,{"key":23,"text":24,"correct":14},"D","各个因素的影响程度之和，应与分析对象的总差异相等","2021\u002F2020教材P119页 (3)以目标数为基础，将各因素的目标数相乘，作为分析替代的基数；@##",{"id":6,"name":27,"category":28,"favorite":29},"二建建设工程施工管理","建筑工程",0]