[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1118394":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},1118394,789,1,"单选题","在综合成本分析方法中，可作为施工项目成本分析基础的是()。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","月（季）度成本分析",false,{"key":16,"text":17,"correct":18},"B","分部分项工程成本分析",true,{"key":20,"text":21,"correct":14},"C","年度成本分析",{"key":23,"text":24,"correct":14},"D","单位工程竣工成本分析","2021\u002F2020教材P123页 分部分项工程成本分析是施工项目成本分析的基础。分部分项工程成本分析的对象为已完成分部分项工程。@##",{"id":6,"name":27,"category":28,"favorite":29},"二建建设工程施工管理","建筑工程",0]