[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1118373":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},1118373,789,1,"单选题","施工过程中，在分部分项工程成本分析时，目标成本应来自()。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","概算成本",false,{"key":16,"text":17,"correct":14},"B","投标报价",{"key":19,"text":20,"correct":21},"C","施工预算",true,{"key":23,"text":24,"correct":14},"D","实际成本","2021\u002F2020教材P122页 分部分项工程成本分析的资料来源是：预算成本来自投标报价成本。目标成本来自施工预算",{"id":6,"name":27,"category":28,"favorite":29},"二建建设工程施工管理","建筑工程",0]