[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1118357":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},1118357,789,1,"单选题","下列费用偏差原因，属于由于业主原因的是（）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","协调不佳",true,{"key":16,"text":17,"correct":18},"B","人工涨价",false,{"key":20,"text":21,"correct":18},"C","图纸提供不及时",{"key":23,"text":24,"correct":18},"D","材料代用","2021\u002F2020教材P115页 由图可知A属于业主原因；B属于物价上涨；C属于设计原因；D属于施工原因。",{"id":6,"name":27,"category":28,"favorite":29},"二建建设工程施工管理","建筑工程",0]