[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1118319":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},1118319,789,1,"单选题","施工项目的成本计划中，()是工程项目投标及签订合同阶段的估算成本计划。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","竞争性成本计划",true,{"key":16,"text":17,"correct":18},"B","指导性成本计划",false,{"key":20,"text":21,"correct":18},"C","实施性成本计划",{"key":23,"text":24,"correct":18},"D","单位工程成本计划","2021\u002F2020教材P102页 以上3类成本计划互相衔接和不断深化，构成了整个工程施工成本的计划过程。其中，竞争性成本计划带有成本战略的性质，是项目投标阶段商务标书的基础，而有竞争力的商务标书又是以其先进合理的技术标书为支撑的。",{"id":6,"name":27,"category":28,"favorite":29},"二建建设工程施工管理","建筑工程",0]