[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1118311":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},1118311,789,1,"单选题","某施工企业为获得某工程的施工任务，在投标过程中估算本企业完成招标工程所需要支出的全部费用。该阶段所编制的成本计划属于（）",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","竞争性成本计划",true,{"key":16,"text":17,"correct":18},"B","指导性成本计划",false,{"key":20,"text":21,"correct":18},"C","实施性成本计划",{"key":23,"text":24,"correct":18},"D","战略性成本计划","2021\u002F2020教材P101页 对于一个施工项目而言，其成本计划的编制是一个不断深化的过程，在这一过程的不同阶段形成深度和作用不同的成本计划，按其作用可分为三类：(1)竞争性成本计划，即工程项目投标及签订合同阶段的估算成本计划；(2)指导性成本计划，即选派项目经理阶段的预算成本计划，是项目经理的责任成本目标；(3)实施性成本计划，即项目施工准备阶段的施工预算成本计划。",{"id":6,"name":27,"category":28,"favorite":29},"二建建设工程施工管理","建筑工程",0]