[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1118259":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},1118259,789,1,"单选题","某施工企业为获得某工程的施工任务，在投标过程中估算企业完成招标所需要支出的全部费用。该阶段所编制的成本计划属于（）",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","竞争性成本计划",true,{"key":16,"text":17,"correct":18},"B","指导性成本计划",false,{"key":20,"text":21,"correct":18},"C","实施性成本计划",{"key":23,"text":24,"correct":18},"D","战略性成本计划","2021\u002F2020教材P101页 竞争性成本计划即工程项目投标及签订合同阶段的估算成本计划。",{"id":6,"name":27,"category":28,"favorite":29},"二建建设工程施工管理","建筑工程",0]