[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1118181":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},1118181,789,1,"单选题","某筑坝围海工程完成过半时，遭遇强台风正面登陆，堤坝已完合格部分被摧毁，不得不重新设计，工期延长，其损失应由()承担。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","承包人",false,{"key":16,"text":17,"correct":18},"B","业主",true,{"key":20,"text":21,"correct":14},"C","设计单位",{"key":23,"text":24,"correct":14},"D","监理单位","2021\u002F2020教材P83页 承包人在停工期间按照发包人要求照管、清理和修复工程的费用由发包人承担。",{"id":6,"name":27,"category":28,"favorite":29},"二建建设工程施工管理","建筑工程",0]