[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1118145":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},1118145,789,1,"单选题","工程量清单中综合单价的构成中包括下列选项中的()。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","措施项目费",false,{"key":16,"text":17,"correct":18},"B","管理费",true,{"key":20,"text":21,"correct":14},"C","规费和税金",{"key":23,"text":24,"correct":14},"D","风险费用","2021\u002F2020教材P64页 《计价规范》中的工程量清单综合单价是指完成一个规定计量单位的分部分项工程量清单项目或措施清单项目所需的人工费、材料费、施工机具使用费和企业管理费与利润，以及一定范围内的风险费用。@##",{"id":6,"name":27,"category":28,"favorite":29},"二建建设工程施工管理","建筑工程",0]