[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1118122":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},1118122,789,1,"单选题","将清单项目的()汇总得到该清单项目的合价，将该清单项目合价除以清单项目的工程量即可得到该清单项目的综合单价。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","直接工程费、管理费和利润",true,{"key":16,"text":17,"correct":18},"B","直接工程费、规费和利润",false,{"key":20,"text":21,"correct":18},"C","间接费、措施费和利润",{"key":23,"text":24,"correct":18},"D","措施费、规费和利润","2021\u002F2020教材P63页 综合单价=人工费+材料费+施工机具使用费+管理费+利润",{"id":6,"name":27,"category":28,"favorite":29},"二建建设工程施工管理","建筑工程",0]