[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1118101":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},1118101,789,1,"单选题","已知某斗容量1m3正铲挖土机，挖四类土，装车，深度在2m内，小组成员两人，定额单位为100m3，机械时间定额为0.21台班，则挖100m3的人工时间定额为（）",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","0.42台班",false,{"key":16,"text":17,"correct":14},"B","4.76工日",{"key":19,"text":20,"correct":21},"C","0.42工日",true,{"key":23,"text":24,"correct":14},"D","4.76台班","2021\u002F2020教材P63页 0.21*1*2=0.42@##",{"id":6,"name":27,"category":28,"favorite":29},"二建建设工程施工管理","建筑工程",0]