[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1118086":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},1118086,789,1,"单选题","施工项目经理部编制作业计划时，最合理的定额依据是()。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","施工定额",true,{"key":16,"text":17,"correct":18},"B","预算定额",false,{"key":20,"text":21,"correct":18},"C","概算定额",{"key":23,"text":24,"correct":18},"D","概算指标","2021\u002F2020教材P58页 施工定额是建筑安装施工企业进行施工组织、成本管理、经济核算和投标报价的重要依据，属于企业定额性质。施工定额直接应用于施工项目的施工管理，用来编制施工作业计划、签发施工任务单、签发限额领料单，以及结算计件工资或计量奖励工资等。",{"id":6,"name":27,"category":28,"favorite":29},"二建建设工程施工管理","建筑工程",0]