[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1118065":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},1118065,789,1,"单选题","时间定额与产量定额之间的关系为( )。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","互为倒数",true,{"key":16,"text":17,"correct":18},"B","互成正比",false,{"key":20,"text":21,"correct":18},"C","需分别独立测算",{"key":23,"text":24,"correct":18},"D","不存在直接关系","2021\u002F2020教材P61页 时间定额与产量定额互为倒数，即：时间定额×产量定额=1，教材上虽然没有说，但是二者的定义在，是可以推导出来的，要能了解。",{"id":6,"name":27,"category":28,"favorite":29},"二建建设工程施工管理","建筑工程",0]