[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1118060":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},1118060,789,1,"单选题","施工定额是以()为对象编制的。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","同一性质的施工过程——工序",true,{"key":16,"text":17,"correct":18},"B","建筑物或构筑物各个分项工程",false,{"key":20,"text":21,"correct":18},"C","扩大的分部分项工程",{"key":23,"text":24,"correct":18},"D","独立的单项工程或完整的工程项目","2021\u002F2020教材P58页 施工定额是以同一性质的施工过程—工序作为研究对象，表示生产产品数量与时间消耗综合关系编制的定额。",{"id":6,"name":27,"category":28,"favorite":29},"二建建设工程施工管理","建筑工程",0]