[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1118005":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},1118005,789,1,"单选题","根据《建设工程工程量清单计价规范》(GB50500-2008)，投标人所填报的分部分项工程的综合单价中不包括()。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","规费",true,{"key":16,"text":17,"correct":18},"B","利润",false,{"key":20,"text":21,"correct":18},"C","企业管理费",{"key":23,"text":24,"correct":18},"D","材料费","2021\u002F2020教材P56页 综合单价包括人工费、材料费、施工机具使用费、企业管理费和利润以及一定范围的风险费用。",{"id":6,"name":27,"category":28,"favorite":29},"二建建设工程施工管理","建筑工程",0]