[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1117931":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},1117931,789,1,"单选题","分析各种风险的损失量属于()阶段的工作。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","风险识别",false,{"key":16,"text":17,"correct":18},"B","风险评估",true,{"key":20,"text":21,"correct":14},"C","风险响应",{"key":23,"text":24,"correct":14},"D","风险控制","2021\u002F2020教材P40页 风险评估包括以下工作：(2)分析各种风险的损失量。",{"id":6,"name":27,"category":28,"favorite":29},"二建建设工程施工管理","建筑工程",0]