[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1117911":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},1117911,789,1,"单选题","在项目实施之前，由法定代表人或其授权人与项目经理协商制定项目管理目标责任书时，不应作为依据的是（）。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","项目合同文件",false,{"key":16,"text":17,"correct":14},"B","组织的经营方针和目标",{"key":19,"text":20,"correct":14},"C","项目管理规划大纲",{"key":22,"text":23,"correct":24},"D","项目管理实施规划",true,"2021\u002F2020教材P34页 施工企业与项目经理签订项目管理目标责任书的依据有： 1、项目合同文件； 2、组织的管理制度； 3、项目管理规划大纲； 4、组织的经营方针和目标； 5、项目特点和实施条件与环境；",{"id":6,"name":27,"category":28,"favorite":29},"二建建设工程施工管理","建筑工程",0]