[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1117909":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},1117909,789,1,"单选题","项目目标动态控制的核心是()。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","针对影响目标的各种因素进行预控",false,{"key":16,"text":17,"correct":14},"B","确定目标控制的计划值",{"key":19,"text":20,"correct":21},"C","当发现目标偏离时采取纠偏措施",true,{"key":23,"text":24,"correct":14},"D","进行项目目标的调整","2021\u002F2020教材P28页 项目目标动态控制的核心是在项目实施的过程中定期地进行项目目标的计划值和实际值的比较，当发现目标偏离时采取纠偏措施。",{"id":6,"name":27,"category":28,"favorite":29},"二建建设工程施工管理","建筑工程",0]